Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 10:55 AM
  • 16 0540_16 0539_11172020_030721.mp4

Date
11/17/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13591
Time
2:55 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0540
Downstream MH
16 0539
Dir. of Survey
Downstream
Length Surveyed
217.6 ft.
Total Length
217.6 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
215
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
215
Pipe schematic from manhole 16 0540 to 16 0539
MH: 16 0540MH: 16 0539downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05400 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"13.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"18.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"64.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"88.1 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"91.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"119.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"166.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"169.9 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"214.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish214.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish217.5 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK217.6 ft. AMH - Downstream Manhole, Survey Ends - 16 0539

Observation photos (5)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    18.4 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    88.1 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    169.9 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"

Observations (19)

DistanceCodeObservation
214.6SSS
169.9TBA
64.8TFC
166.7TFC
217.6AMH16 0539
217.5MGOCONNECTION AT MH, 9 O'CLOCK
13.5TFC
119.6TFC
88.1TBA
18.4TB
0AMH16 0540
0MWL
91.7TFC
214.6SAP
0MWM
9.6TFC
2MGOMAG COAT
2SSS
2SAP

Properties (6)

custom_field_three
AGGREGATE , SPALLING
custom_field_two
3
customer
1
datetime
2020-11-17T02:55:49-08:00
documentation
PRO PIPE
is_lateral_inspection
false