Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 11:08 AM
  • 16 0539_16 0538_11172020_032141.mp4

Date
11/17/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13590
Time
3:08 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0539
Downstream MH
16 0538
Dir. of Survey
Downstream
Length Surveyed
231.4 ft.
Total Length
231.4 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
225
Pipe schematic from manhole 16 0539 to 16 0538
MH: 16 0539MH: 16 0538downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05390 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK2.5 ft. MGO - General Observation - MAG COAT2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"31.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"78.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"83 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"130.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"134.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"181.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"185 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"224.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"229 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish229 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish231.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK231.4 ft. AMH - Downstream Manhole, Survey Ends - 16 0538

Observation photos (4)

  • General Observation - MAG COAT

    2.5 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    224.3 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

Observations (20)

DistanceCodeObservation
185TFC
2.5MGOMAG COAT
229SSS
130.2TFC
0MWL
27.6TFC
0MWM
0AMH16 0539
229SAP
78.6TFC
224.3TB
83TFC
0MGOCONNECTION AT MH, 9 O'CLOCK
2.5SSS
231.3MGOCONNECTION AT MH, 9 O'CLOCK
134.6TF
231.4AMH16 0538
181.2TFC
2.5SAP
31.9TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-17T03:08:10-08:00
documentation
PRO PIPE
is_lateral_inspection
false