Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 06:12 AM
  • 16 0536_16 0535_11172020_222515.mp4

Date
11/17/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13587
Time
10:12 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8216
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0536
Downstream MH
16 0535
Dir. of Survey
Downstream
Length Surveyed
223.5 ft.
Total Length
223.5 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
220
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
220
Pipe schematic from manhole 16 0536 to 16 0535
MH: 16 0536MH: 16 0535downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05362.8 ft. MGO - General Observation - MAG COAT2.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"50.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"94.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"98.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"145.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"149.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"196.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"200.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"221.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish221.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish223.5 ft. AMH - Downstream Manhole, Survey Ends - 16 0535

Observation photos (4)

  • General Observation - MAG COAT

    2.8 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    149.3 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

Observations (17)

DistanceCodeObservation
94.2TFC
149.3TB
0MWL
221.5SSS
200.9TF
221.5SAP
0MWM
196.6TFC
2.8MGOMAG COAT
47.5TFC
98.8TFC
223.5AMH16 0535
50.5TFC
2.8SSS
0AMH16 0536
145.1TFC
2.8SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-17T22:12:08-08:00
documentation
PRO PIPE
is_lateral_inspection
false