Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 06:27 AM
  • 16 0535_16 0534_11172020_232009.mp4

Date
11/17/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13586
Time
10:27 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8216
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0535
Downstream MH
16 0534
Dir. of Survey
Downstream
Length Surveyed
222.7 ft.
Total Length
222.7 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
215
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
217
Pipe schematic from manhole 16 0535 to 16 0534
MH: 16 0535MH: 16 0534downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05350 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area4.4 ft. MGO - General Observation - MAG COAT4.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"30.6 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"78.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"83 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"129.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"133.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"184.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"189.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"221.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish221.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish221.7 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES222.7 ft. AMH - Downstream Manhole, Survey Ends - 16 0534

Observation photos (4)

  • General Observation - MAG COAT

    4.4 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES

    221.7 ft. - Deposits Settled Fine, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
4.4MGOMAG COAT
4.4SAP
30.6TFA
0AMH16 0535
221.4SSS
184.8TFC
189.2TF
4.4SSS
129.7TF
221.7DSF
221.4SAP
83TFC
0MWL
78.5TFC
0MWM
27.5TFC
222.7AMH16 0534
133.4TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-17T22:27:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false