Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 07:41 AM
  • 16 0568_16 0567_11162020_235112.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13619
Time
11:41 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0567
Downstream MH
16 0568
Dir. of Survey
Upstream
Length Surveyed
194.6 ft.
Total Length
194.6 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
190
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
190
Pipe schematic from manhole 16 0567 to 16 0568
MH: 16 0567MH: 16 0568upstream0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 16 05682.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish109.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"113.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6"161 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6"164.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"192.6 ft. MGO - General Observation - MAG COAT192.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start192.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start194.6 ft. AMH - Downstream Manhole, Survey Begins - 16 0567194.6 ft. MWL - Water Level, 10 %of cross sectional area194.6 ft. MWM - Water Mark, 30 %of cross sectional area194.6 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
2MGOMAG COAT
192SSS
194.6MGOCONNECTION AT MH, 3 O'CLOCK
85.3TF
2SSS
192SAP
0AMH16 0567
30TFC
81.2TF
2SAP
0MWL
33.6TF
194.6MGOCONNECTION AT MH, 3 O'CLOCK
0MWM
0MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
194.6AMH16 0568

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T23:41:29-08:00
documentation
PRO PIPE
is_lateral_inspection
false