Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2020, 11:15 AM
  • 16 0565_16 0564_11162020_032650.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13616
Time
3:15 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8211
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0564
Downstream MH
16 0565
Dir. of Survey
Upstream
Length Surveyed
259.2 ft.
Total Length
259.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
255
Pipe schematic from manhole 16 0564 to 16 0565
MH: 16 0564MH: 16 0565upstream0 ft. AMH - Upstream Manhole, Survey Ends - 16 05654 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish31 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"37.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"75.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"182.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6"257.1 ft. MGO - General Observation - MAG COAT257.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start257.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start259.2 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK259.2 ft. MWM - Water Mark, 35 %of cross sectional area259.2 ft. AMH - Downstream Manhole, Survey Begins - 16 0564259.2 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MGOCONNECTION AT MH, 9 O'CLOCK
2SAP
228.2TFA
2.1MGOMAG COAT
255.2SAP
184TF
0MWM
0AMH16 0564
0MWL
255.2SSS
2.1SSS
259.2AMH16 0565
222TFA
77.1TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T03:15:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false