Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2020, 11:31 AM
  • 16 0564_16 0563_11162020_034358.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13615
Time
3:31 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8211
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0564
Downstream MH
16 0563
Dir. of Survey
Downstream
Length Surveyed
180.9 ft.
Total Length
180.9 ft.
Structural Index
3
Structural Quick
3F21
Structural Rating
107
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
107
Pipe schematic from manhole 16 0564 to 16 0563
MH: 16 0564MH: 16 0563downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05640 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT62.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"72.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"111.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"159.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"177 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish177 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish180.9 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK180.9 ft. AMH - Downstream Manhole, Survey Ends - 16 0563

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    72.4 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"

Observations (15)

DistanceCodeObservation
0AMH16 0564
2SAP
2SSS
62.1TF
72.4TBA
0MWM
0MGOCONNECTION AT MH, 3 O'CLOCK
159.8TF
0MWL
180.9MGOCONNECTION AT MH, 9 O'CLOCK
111.2TF
177SSS
180.9AMH16 0563
177SAP
2MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T03:31:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false