Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2020, 11:48 AM
  • 16 0562_16 0561_11162020_035933.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13613
Time
3:48 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8211
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0562
Downstream MH
16 0561
Dir. of Survey
Downstream
Length Surveyed
228.8 ft.
Total Length
228.8 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
225
Pipe schematic from manhole 16 0562 to 16 0561
MH: 16 0562MH: 16 0561downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05620 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area3.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. MGO - General Observation - MAG COAT3.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"51.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"75.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"95 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"130.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"150.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"177.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"226 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish226 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish228.8 ft. AMH - Downstream Manhole, Survey Ends - 16 0561228.8 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    3.3 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
3.3SSS
3.3MGOMAG COAT
51.8TF
0AMH16 0562
130.3TFA
228.8AMH16 0561
226SSS
0MGOCONNECTION AT MH, 9 O'CLOCK
0MWM
3.3SAP
0MGOCONNECTION AT MH, 9 O'CLOCK
228.8MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
0MWL
31.9TF
75.5TF
95TF
177.6TF
226SAP
150.3TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T03:48:52-08:00
documentation
PRO PIPE
is_lateral_inspection
false