Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 05:11 AM
  • 16 0558_16 0557_11162020_212505.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13609
Time
9:11 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0558
Downstream MH
16 0557
Dir. of Survey
Downstream
Length Surveyed
311.9 ft.
Total Length
311.9 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
305
Pipe schematic from manhole 16 0558 to 16 0557
MH: 16 0558MH: 16 0557downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05580 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start39.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"62 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"66.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"70.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"171.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"175.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"224.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"274.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"298.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"307 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish307 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311.9 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK311.9 ft. AMH - Downstream Manhole, Survey Ends - 16 0557

Observation photos (6)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    62 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    66.5 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    70.3 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (19)

DistanceCodeObservation
175.7TF
224.5TFA
298.4TF
0AMH16 0558
2MGOMAG COAT
307SAP
39.8TFA
0MWM
70.3TB
274.9TF
311.9MGOCONNECTION AT MH, 3 O'CLOCK
307SSS
2SAP
171.3TF
66.5TBA
311.9AMH16 0557
0MWL
2.1SSS
62TB

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T21:11:15-08:00
documentation
PRO PIPE
is_lateral_inspection
false