Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 05:40 AM
  • 16 0556_16 0555_11162020_215702.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13607
Time
9:40 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0556
Downstream MH
16 0555
Dir. of Survey
Downstream
Length Surveyed
307 ft.
Total Length
307 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
309
Pipe schematic from manhole 16 0556 to 16 0555
MH: 16 0556MH: 16 0555downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05562.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. MGO - General Observation - MAG COAT2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"19.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"63.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"67.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"112.8 ft. RMB - Roots Medium Barrell, at 10 o'clock, 5 %, within 8 inches of joint: YES114.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"118.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"162.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"166.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"217.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"265 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"305.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish305.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish307 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK307 ft. AMH - Downstream Manhole, Survey Ends - 16 0555

Observation photos (7)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.7 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    8.4 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    63.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Roots Medium Barrell, at 10 o'clock, 5 %, within 8 inches of joint: YES

    112.8 ft. - Roots Medium Barrell, at 10 o'clock, 5 %, within 8 inches of joint: YES

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    114.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

Observations (21)

DistanceCodeObservation
2.7SAP
19.9TFC
305.3SSS
217.9TFC
307MGOCONNECTION AT MH, 3 O'CLOCK
2.7MGOMAG COAT
67.2TFA
305.3SAP
162.2TFC
0MWM
2.7SSS
118.6TFC
112.8RMB
166.1TFC
265TFC
0MWL
307AMH16 0555
8.4TB
63.2TB
114.9TB
0AMH16 0556

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T21:40:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false