Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2020, 10:39 AM
  • 16 0554_16 0553_11162020_025113.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13605
Time
2:39 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8211
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0553
Downstream MH
16 0554
Dir. of Survey
Upstream
Length Surveyed
216 ft.
Total Length
216 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
210
Pipe schematic from manhole 16 0553 to 16 0554
MH: 16 0553MH: 16 0554upstream0 ft. AMH - Upstream Manhole, Survey Ends - 16 05540 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"75.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"79.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6"119.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"142.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"166.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"198.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"202.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"214 ft. MGO - General Observation - MAG COAT214 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start214 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start216 ft. MWM - Water Mark, 30 %of cross sectional area216 ft. MWL - Water Level, 10 %of cross sectional area216 ft. AMH - Downstream Manhole, Survey Begins - 16 0553

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
49.8TFA
96.6TFC
216AMH16 0554
73.2TF
2MGOMAG COAT
140.7TFC
2SAP
0MWM
191.8TFA
213.7SSS
136.3TF
13.5TFC
17.9TFA
0MWL
216MGOCONNECTION AT MH, 9 O'CLOCK
0AMH16 0553
2SSS
213.7SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T02:39:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false