Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 06:44 AM
  • 16 0550_16 0549_11162020_225821.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13601
Time
10:44 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0550
Downstream MH
16 0549
Dir. of Survey
Downstream
Length Surveyed
261 ft.
Total Length
261 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole 16 0550 to 16 0549
MH: 16 0550MH: 16 0549downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05500 ft. MWM - Water Mark, 35 %of cross sectional area2.9 ft. MGO - General Observation - MAG COAT2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"31.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"75 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"115.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"119.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"154.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"158.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"171 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock192.1 ft. RFB - Roots Fine Barrell, from 09 to 12 o'clock194.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"202 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"205.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"245.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"249.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"258.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish261 ft. AMH - Downstream Manhole, Survey Ends - 16 0549

Observation photos (7)

  • General Observation - MAG COAT

    2.9 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    75 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

  • Roots Fine Barrell, from 09 to 03 o'clock

    171 ft. - Roots Fine Barrell, from 09 to 03 o'clock

  • Roots Fine Barrell, from 09 to 12 o'clock

    192.1 ft. - Roots Fine Barrell, from 09 to 12 o'clock

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    194.2 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

Observations (23)

DistanceCodeObservation
249.5TFC
31.9TFC
2.9MGOMAG COAT
2.9SAP
258.1SAP
245.7TFC
171RFB
12TFC
192.1RFB
194.2TB
0MWL
0AMH16 0550
0MWM
115.1TFC
202TFC
2.9SSS
258.1SSS
154.9TFC
119.2TFC
158.4TFC
261AMH16 0549
75TB
205.9TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING AND SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T22:44:41-08:00
documentation
PRO PIPE
is_lateral_inspection
false