Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 06:59 AM
  • 16 0549_16 0548_11162020_231141.mp4

Date
11/16/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13600
Time
10:59 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0549
Downstream MH
16 0548
Dir. of Survey
Downstream
Length Surveyed
227.3 ft.
Total Length
227.3 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
225
Pipe schematic from manhole 16 0549 to 16 0548
MH: 16 0549MH: 16 0548downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05492.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start39.5 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"43.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"82.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"86.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"126.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"130.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"174.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"178.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"226.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish226.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227.3 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK227.3 ft. AMH - Downstream Manhole, Survey Ends - 16 0548

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.3 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    39.5 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    43.2 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

Observations (18)

DistanceCodeObservation
226.7SSS
39.5TB
2.3SSS
227.3MGOCONNECTION AT MH, 3 O'CLOCK
0MWM
86.8TFC
0MWL
227.3AMH16 0548
174.4TFC
226.7SAP
178.5TFC
0AMH16 0549
43.2TB
130.4TFC
82.9TFC
2.3MGOMAG COAT
126.4TFC
2.3SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-16T22:59:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false