Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 08:28 AM
  • 16 0547_16 0546_11182020_003821.mp4

Date
11/18/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13598
Time
12:28 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8216
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0547
Downstream MH
16 0546
Dir. of Survey
Downstream
Length Surveyed
236.9 ft.
Total Length
236.9 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
237
Pipe schematic from manhole 16 0547 to 16 0546
MH: 16 0547MH: 16 0546downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05470 ft. MWL - Water Level, 10 %of cross sectional area3.3 ft. MGO - General Observation - MAG COAT3.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"42.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"131.3 ft. RFB - Roots Fine Barrell, from 11 to 12 o'clock236.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish236.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish236.9 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK236.9 ft. AMH - Downstream Manhole, Survey Ends - 16 0546

Observation photos (4)

  • General Observation - MAG COAT

    3.3 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Barrell, from 11 to 12 o'clock

    131.3 ft. - Roots Fine Barrell, from 11 to 12 o'clock

Observations (13)

DistanceCodeObservation
0MWM
236.9MGOCONNECTION AT MH, 9 O'CLOCK
236.2SSS
236.5SAP
236.9AMH16 0546
3.3MGOMAG COAT
38TFC
3.3SSS
42.2TF
0AMH16 0547
0MWL
3.3SAP
131.3RFB

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-18T00:28:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false