Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 08:39 AM
  • 16 0546_16 0545_11182020_005013.mp4

Date
11/18/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13597
Time
12:39 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8216
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0546
Downstream MH
16 0545
Dir. of Survey
Downstream
Length Surveyed
260.2 ft.
Total Length
260.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
355
Pipe schematic from manhole 16 0546 to 16 0545
MH: 16 0546MH: 16 0545downstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05464.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. MGO - General Observation - MAG COAT8.7 ft. RFB - Roots Fine Barrell, from 11 to 01 o'clock, Start107 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"110.5 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"258.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.5 ft. RFB - Roots Fine Barrell, from 11 to 01 o'clock, Finish258.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.2 ft. AMH - Downstream Manhole, Survey Ends - 16 0545260.2 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    4.4 ft. - General Observation - MAG COAT

  • Roots Fine Barrell, from 11 to 01 o'clock, Start

    8.7 ft. - Roots Fine Barrell, from 11 to 01 o'clock, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    110.5 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

Observations (15)

DistanceCodeObservation
0MGOCONNECTION AT MH, 9 O'CLOCK
4.4SAP
110.5TB
260.2AMH16 0545
258.5SAP
8.7RFB
258.5RFB
0MWL
0MWM
0AMH16 0546
4.4SSS
107TF
258.5SSS
4.4MGOMAG COAT
260.2MGOCONNECTION AT MH, 9 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-18T00:39:03-08:00
documentation
PRO PIPE
is_lateral_inspection
false