Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 10:55 AM
  • 18 0240_18 0239 _11202020_034947.mp4

Date
11/20/2020
W/O
855022
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00674
PipeID
P14068
Time
2:55 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8219
Sewer Name
EAST IMPERIAL HIGHWAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_855022_TV18005_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0240
Downstream MH
18 0239
Dir. of Survey
Downstream
Length Surveyed
369.9 ft.
Total Length
369.9 ft.
Structural Index
3
Structural Quick
3N22
Structural Rating
223
O&M Index
2
O&M Quick
312N
O&M Rating
149
Overall Index
3
Overall Quick
Overall Rating
372
Pipe schematic from manhole 18 0240 to 18 0239
MH: 18 0240MH: 18 0239downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02400 ft. MWL - Water Level, 5 %of cross sectional area3.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start4.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"80 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"118.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"189.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"242.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"292.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"342 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"361.3 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area, Start369.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0239 ZOOMED IN369.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish369.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish369.9 ft. OBZ - Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock - UNKNOWN369.9 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area, Finish

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    3.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 30 %of cross sectional area, Start

    361.3 ft. - Water Level, Sag in pipe, 30 %of cross sectional area, Start

  • Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock - UNKNOWN

    369.9 ft. - Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock - UNKNOWN

Observations (18)

DistanceCodeObservation
0MWM
369.9AMH18 0239 ZOOMED IN
242.5TF
292.2TF
4.7CM
369.9DAGS
3.1DAGS
118.2TF
369.9CM
342TFC
369.9OBZUNKNOWN
80TFC
369.9MWLS
189.8TF
0AMH18 0240
361.3MWLS
30.3TF
0MWL

Properties (6)

custom_field_three
MULTIPLE CRACKS, GREASE
custom_field_two
3
customer
1
datetime
2020-11-20T02:55:35-08:00
documentation
PRO PIPE
is_lateral_inspection
false