Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 1, 2020, 06:09 AM
  • 18 0237_18 0236 _11302020_222114.mp4

Date
11/30/2020
W/O
855022
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00674
PipeID
P14065
Time
10:09 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8225
Sewer Name
EAST IMPERIAL HIGHWAY TRUNK
City
LA MIRADA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_855022_TV18005_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0237
Downstream MH
18 0236
Dir. of Survey
Downstream
Length Surveyed
100 ft.
Total Length
100 ft.
Structural Index
4
Structural Quick
4532
Structural Rating
26
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
26
Pipe schematic from manhole 18 0237 to 18 0236
MH: 18 0237MH: 18 0236downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02370 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area9.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"68.3 ft. FM - Fracture Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES71.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish71.8 ft. FS - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES79.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start84.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"97.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish100 ft. AMH - Downstream Manhole, Survey Ends - 18 0236

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES

    68.3 ft. - Fracture Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES

    71.8 ft. - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    79.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
71.8CM
0MWL
9.4CM
42.4TFC
68.3FM
84.6TF
79.4FM
71.8FS
0AMH18 0237
100AMH18 0236
0MGOCONNECTION AT MH, 9 O'CLOCK
0MWM
97.2FM

Properties (7)

additional_info
63007511240203
custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2020-11-30T22:09:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false