Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 1, 2020, 06:22 AM
  • 18 0236_18 0235 _11302020_223615.mp4

Date
11/30/2020
W/O
855022
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00674
PipeID
P14064
Time
10:22 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8225
Sewer Name
EAST IMPERIAL HIGHWAY TRUNK
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_855022_TV18005_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0236
Downstream MH
18 0235
Dir. of Survey
Downstream
Length Surveyed
256.3 ft.
Total Length
256.3 ft.
Structural Index
4
Structural Quick
4731
Structural Rating
31
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
33
Pipe schematic from manhole 18 0236 to 18 0235
MH: 18 0236MH: 18 0235downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02360 ft. MWL - Water Level, 15 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"85.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"139.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"189 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"218.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish218.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start239 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"253.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish253.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish256.3 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK256.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0235

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    218.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
2.2DAGS
239TFC
189TFC
85.9TF
256.3MGOCONNECTION AT MH, 3 O'CLOCK
0MWM
253.6FM
0AMH18 0236
256.3AMH18 0235
218.1CM
253.6DAGS
0MWL
5.2CM
36.5TF
139.7TF
218.1FM

Properties (6)

custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2020-11-30T22:22:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false