- Date
- 04/30/2018
- W/O
- 0703170
- Weather
- Dry
- Operator/Surveyor
- SANTIAGO OBREGON
- Sewer ID
- Z01106
- PipeID
- P24571
- Time
- 12:46 PM
- Certificate
- U-1014-06022541
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G6993
- Sewer Name
- 29 19TH STREET SEWER
- City
- SIGNAL HILL
- Loc. details
- Main Highway - Suburban/Rural
- Location Code
- B
- Use of Sewer
- Sanitary Sewer
- District
- District 29
- Page No.
- 03
- Purpose
- Capital Improvement Program Assesment
- Project
- 20180430SHO_19TH_STREET_SEWER
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 8 in.
- Upstream MH
- 29 0519
- Downstream MH
- 29 0519A
- Dir. of Survey
- Upstream
- Length Surveyed
- 291.4 ft.
- Total Length
- 291.4 ft.
- Structural Index
- 3
- Structural Quick
- 4131
- Structural Rating
- 11
- O&M Index
- 2
- O&M Quick
- 2200
- O&M Rating
- 4
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 15
Pipe schematic from manhole 29 0519 to 29 0519A Observation photos (4)

288 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"

290 ft. - Deposits Settled Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

290 ft. - Fracture Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

291.4 ft. - Upstream Manhole, Survey Ends - 0145