Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2020, 06:41 PM
  • 29 0136_29 0135_11062020_105712.mp4

Date
11/06/2020
W/O
860503
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01116
PipeID
P24028
Time
10:41 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7395
Sewer Name
29 SPRING STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_860503_TV29097_NOV2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0135
Downstream MH
29 0136
Dir. of Survey
Upstream
Length Surveyed
274.3 ft.
Total Length
274.3 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
159
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
159
Pipe schematic from manhole 29 0135 to 29 0136
MH: 29 0135MH: 29 0136upstream0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 01360.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish3.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"6.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"53.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"56.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"103.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"106.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"153.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"156 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"203.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"206.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"250.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"253.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"264 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start274.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK274.3 ft. MWL - Water Level, 5 %of cross sectional area274.3 ft. MWM - Water Mark, 20 %of cross sectional area274.3 ft. AMH - Downstream Manhole, Survey Begins - 29 0135

Observation photos (1)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
23.7TFC
168.2TFC
268.1TFA
0MGOCONNECTION AT MH, 9 O'CLOCK
68TFC
218.2TFC
274.3ACOM29 0136
118.3TFC
20.8TF
271.1TFC
10.3CM
70.5TF
221.1TFC
0MWL
170.8TFC
0MWM
120.5TFC
273.9CM
0AMH29 0135

Properties (6)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2020-11-06T10:41:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false