Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2020, 06:19 PM
  • 29 0135_29 0131_11062020_104003.mp4

Date
11/06/2020
W/O
860503
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01116
PipeID
P24027
Time
10:19 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7395
Sewer Name
29 SPRING STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_860503_TV29097_NOV2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0131
Downstream MH
29 0135
Dir. of Survey
Upstream
Length Surveyed
315.5 ft.
Total Length
315.5 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
180
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
180
Pipe schematic from manhole 29 0131 to 29 0135
MH: 29 0131MH: 29 0135upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 01350.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK3.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish25 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"27.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"77.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"86.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"125 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"133.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"174.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"177.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"228.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"230.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"275.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"278.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"287.4 ft. MWM - Water Mark, 10 %of cross sectional area287.5 ft. MWL - Water Level, 5 %of cross sectional area300.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start310.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES315.5 ft. AMH - Downstream Manhole, Survey Begins - 29 0131315.5 ft. MWM - Water Mark, 40 %of cross sectional area315.5 ft. MWL - Water Level, 30 %of cross sectional area315.5 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
140.6TF
87.4TFC
0AMH29 0131
0MWM
85TFC
15.2CM
0MWL
0MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
290.5TFC
190.5TFC
315.5AMH29 0135
288.2TF
5CM
315.2MGOCONNECTION AT MH, 9 O'CLOCK
182.3TFC
229TFC
138TF
237.7TFC
28.1MWM
312.4CM
37.4TFC
28MWL
40.3TF

Properties (6)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2020-11-06T10:19:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false