Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2020, 07:32 PM
  • 29 0131_29 0130_11062020_114651.mp4

Date
11/06/2020
W/O
860503
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01116
PipeID
P24023
Time
11:32 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7395
Sewer Name
29 SPRING STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_860503_TV29097_NOV2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0131
Downstream MH
29 0130
Dir. of Survey
Downstream
Length Surveyed
334.3 ft.
Total Length
334.3 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
195
Pipe schematic from manhole 29 0131 to 29 0130
MH: 29 0131MH: 29 0130downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 29 01310 ft. MWM - Water Mark, 25 %of cross sectional area7.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start74.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"85.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"121.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"124.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"174.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"197.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"224.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"247.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"274.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"322.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"324.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"331.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.3 ft. AMH - Downstream Manhole, Survey Ends - 29 0130

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
197.8TF
74.2TF
274.3TF
247.9TF
7.1CM
0MWL
0MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
174.7TF
322.1TFC
85.4TF
224.4TFC
0AMH29 0131
331.6CM
334.3AMH29 0130
124.1TFC
324.5TFC
0MWM
121.3TFC

Properties (6)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2020-11-06T11:32:18-08:00
documentation
PRO PIPE
is_lateral_inspection
false