Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2020, 08:34 AM
  • H 0637_H 0616_11132020_005703.mp4

Date
11/12/2020
W/O
855028
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00192
PipeID
P20469
Time
12:34 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8194
Sewer Name
JOINT OUTFALL H - UNIT 8J
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_855028_TV15199_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 0637
Downstream MH
H 0616
Dir. of Survey
Downstream
Length Surveyed
497 ft.
Total Length
497 ft.
Structural Index
3
Structural Quick
3S2G
Structural Rating
375
O&M Index
2
O&M Quick
2S00
O&M Rating
198
Overall Index
2
Overall Quick
Overall Rating
573
Pipe schematic from manhole H 0637 to H 0616
MH: H 0637MH: H 0616downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06370 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.2 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"8.2 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"16.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"21.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"156 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"213.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"275.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"301.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start321.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"325 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"386 ft. MGO - General Observation - CONNECTION PASSED-BY @ 10 O'CLOCK390.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"415.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"443.5 ft. MGO - General Observation - CONNECTION PASSED-BY @ 10 O'CLOCK497 ft. MGO - General Observation - ROACHES IN MH497 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish497 ft. AMH - Downstream Manhole, Survey Ends - H 0616497 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish497 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    301.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    497 ft. - General Observation - ROACHES IN MH

Observations (31)

DistanceCodeObservation
497MGOROACHES IN MH
222.7TFA
497SSS
325TFA
95.9TF
386MGOCONNECTION PASSED-BY @ 10 O'CLOCK
156TFA
390.7TFA
176.5TBA
497AMHH 0616
70TFC
189.9TFA
21.1TFC
321.1TFA
2DAGS
271.7TFC
497DAGS
0MWL
2SAP
8.2TFA
415.2TFC
497SAP
16.7TFA
301.3SSS
0AMHH 0637
213.9TFC
443.5MGOCONNECTION PASSED-BY @ 10 O'CLOCK
144.2TFA
275.7TFA
0MWM
8.2TBA

Properties (7)

additional_info
630069111220203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-12T00:34:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false