Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 13, 2020, 10:13 AM
  • H 1229_H 1228_11132020_024028.mp4

Date
11/13/2020
W/O
855014
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01182
PipeID
P17653
Time
2:13 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8196
Sewer Name
JOINT OUTFALL H - UNIT 8K RELIEF
City
VINCENT
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_855014_TV15222_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1229
Downstream MH
H 1228
Dir. of Survey
Downstream
Length Surveyed
438.1 ft.
Total Length
438.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole H 1229 to H 1228
MH: H 1229MH: H 1228downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 12290 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.4 ft. MGO - General Observation - MAG COATING THROUGHOUT5.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start349.8 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"394.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"436.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish436.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish436.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish436.5 ft. MGO - General Observation - ROACHES IN MH438.1 ft. AMH - Downstream Manhole, Survey Ends - H 1228

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    5.4 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    436.5 ft. - General Observation - ROACHES IN MH

Observations (14)

DistanceCodeObservation
436.5DAGS
5.4MGOMAG COATING THROUGHOUT
436.5SSS
436.5SAP
438.1AMHH 1228
0AMHH 1229
0MWM
0MWL
394.1TFA
436.5MGOROACHES IN MH
349.8TFA
5.5SAP
2DAGS
5.5SSS

Properties (8)

additional_info
630069111220205
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-13T02:13:07-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30904