Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2020, 06:10 AM
  • 22 0864_22 0863 _12032020_222846.mp4

Date
12/03/2020
W/O
854654
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00803
PipeID
P17231
Time
10:10 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8324
Sewer Name
DALTON TRUNK, SECTION 3
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_854654_TV22158_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0864
Downstream MH
22 0863
Dir. of Survey
Downstream
Length Surveyed
375.4 ft.
Total Length
375.4 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
13
Pipe schematic from manhole 22 0864 to 22 0863
MH: 22 0864MH: 22 0863downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 08640 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area4.3 ft. MGO - General Observation - MAG COAT4.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"11.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"56.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"79 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"108.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"160.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"211 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES218.3 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start256.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"263.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"308.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"316 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"366.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"367.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"375.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0863375.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES

    211 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    218.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
375.4SRV
180.3TF
316TF
56.3TF
375.4AMH22 0863
0AMH22 0864
0MWL
64.5TF
128.7TF
4.3MGOMAG COAT
4.3SAV
375.4SAV
11.7TF
160.6TF
367.8TF
0MWM
256.4TF
108.3TF
366.9TF
263.8TFC
308.9TF
218.3SRV
79TF
4.3TFC
211SRV

Properties (7)

additional_info
830075120320201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2020-12-03T22:10:44-08:00
documentation
PROPIPE
is_lateral_inspection
false