Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2018, 03:53 PM
  • B 0096B_B 0096A_8102018_090915.mp4

Date
08/10/2018
W/O
0722651
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00074
PipeID
P08568
Time
8:53 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7782
Sewer Name
B JOINT OUTFALL B - UNIT 1C
City
PARAMOUNT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
35
Purpose
Routine Assessment
Project
20180810SHO_JOINT_OUTFALL_B_UNIT_1C
Material
Reinforced Concrete Pipe
Shape
Circular
Height
72 in.
Upstream MH
B 0096B
Downstream MH
B 0096A
Dir. of Survey
Downstream
Length Surveyed
30.2 ft.
Total Length
30.2 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
13
Pipe schematic from manhole B 0096B to B 0096A
MH: B 0096BMH: B 0096Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - MH 96B0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area23.4 ft. SRV - Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO, Start23.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start29.6 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES30.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish30.2 ft. SRV - Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO, Finish30.2 ft. AMH - Downstream Manhole, Survey Ends - MH 96A

Observation photos (4)

  • Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO, Start

    23.4 ft. - Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    23.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES

    29.6 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - MH 96A

    30.2 ft. - Downstream Manhole, Survey Ends - MH 96A

Observations (9)

DistanceCodeObservation
0AMHMH 96B
0MWM
30.2SAP
23.5SAP
0MWL
30.2SRV
23.4SRV
29.6SRV
30.2AMHMH 96A

Properties (6)

custom_field_three
REBAR IS VISIBLE
custom_field_two
2
customer
LACSD
datetime
2018-08-10T08:53:00-07:00
documentation
OBREGON, BRAR, VENDRYES, PARAISO
is_lateral_inspection
false