Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2018, 08:14 PM
  • B 0018_B 0016_892018_135953.mp4

Date
08/09/2018
W/O
0721144
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00072
PipeID
P08528
Time
1:14 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7781
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Yard
Location Code
Y
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Routine Assessment
Project
20180809SHO_JOINT_OUTFALL_B_UNIT_1A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Upstream MH
B 0016
Downstream MH
B 0018
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
1
Structural Quick
1100
Structural Rating
1
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole B 0016 to B 0018
MH: B 0016MH: B 0018upstream0 ft. MSA - Survey Abandoned - VIEW OF THE UPLEG OF THE SIPHON0 ft. SRI - Surface Roughness Increased, from 10 to 02 o'clock, within 8 inches of joint: YES2 ft. AMH - Downstream Manhole, Survey Begins - MH B 182 ft. MWL - Water Level, 75 %of cross sectional area2 ft. MWM - Water Mark, 75 %of cross sectional area

Observation photos (2)

  • Survey Abandoned - VIEW OF THE UPLEG OF THE SIPHON

    2 ft. - Survey Abandoned - VIEW OF THE UPLEG OF THE SIPHON

  • Surface Roughness Increased, from 10 to 02 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Roughness Increased, from 10 to 02 o'clock, within 8 inches of joint: YES

Observations (5)

DistanceCodeObservation
0AMHMH B 18
2MSAVIEW OF THE UPLEG OF THE SIPHON
0MWL
2SRI
0MWM

Properties (5)

additional_info
ZOOMING U/S
customer
LACSD
datetime
2018-08-09T13:14:19-07:00
documentation
OBREGON, BRAR, VENDRYES
is_lateral_inspection
false