Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2017, 10:00 AM
  • J 0164_J 0163 _01312017_022619.mp4

Date
01/31/2017
W/O
619081
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00055
PipeID
P11407
Time
2:00 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4098
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
RANCHO PALOS VERDES
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
44
Purpose
Routine Assessment
Project
WO_619081_TV05161_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
J 0164
Downstream MH
J 0163
Dir. of Survey
Downstream
Length Surveyed
651.4 ft.
Total Length
651.4 ft.
Structural Index
3
Structural Quick
3Y00
Structural Rating
387
O&M Index
2
O&M Quick
2Y00
O&M Rating
258
Overall Index
3
Overall Quick
Overall Rating
645
Pipe schematic from manhole J 0164 to J 0163
MH: J 0164MH: J 0163downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 01640 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNESIUM H.O. START648.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish648.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish648.9 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH651.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK ACTIVE651.4 ft. AMH - Downstream Manhole, Survey Ends - J 0163

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMHJ 0164
651.4MGOCONNECTION AT MH 9 O'CLOCK ACTIVE
651.4AMHJ 0163
0MWL
2.1SAV
2.1DAGS
0MWM
2.1MGOMAGNESIUM H.O. START
648.9SAV
648.9DAGS
648.9MGOMAGNEZIUM H.O. FINISH

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-01-31T02:00:37-08:00
documentation
PRO PIPE
is_lateral_inspection
false