Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 27, 2017, 12:03 PM
  • J 0176_J 0175 _01272017_041514.mp4

Date
01/27/2017
W/O
619081
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00055
PipeID
P11415
Time
4:03 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4095
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
SAN PEDRO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47A
Purpose
Routine Assessment
Project
WO_619081_TV05161_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
J 0176
Downstream MH
J 0175
Dir. of Survey
Downstream
Length Surveyed
298.5 ft.
Total Length
298.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole J 0176 to J 0175
MH: J 0176MH: J 0175downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 01762.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAGNEZIUM H.O COATING start298.5 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish298.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish298.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish298.5 ft. AMH - Downstream Manhole, Survey Ends - J 0175

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
2.4DAGS
2.4SAV
298.5MGOMAGNEZIUM H.O COATING finish
298.5SAV
298.5DAGS
298.5AMHJ 0175
0MWL
0AMHJ 0176
2.4MGOMAGNEZIUM H.O COATING start

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-01-27T04:03:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false