Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 30, 2017, 12:17 PM
  • J 0166_J 0165 _01302017_043451.mp4

Date
01/30/2017
W/O
619081
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00055
PipeID
P11409
Time
4:17 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4096
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
RANCHO PALOS VERDES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
44
Purpose
Routine Assessment
Project
WO_619081_TV05161_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
J 0166
Downstream MH
J 0165
Dir. of Survey
Downstream
Length Surveyed
506.1 ft.
Total Length
506.1 ft.
Structural Index
3
Structural Quick
3S00
Structural Rating
300
O&M Index
2
O&M Quick
2S00
O&M Rating
200
Overall Index
3
Overall Quick
Overall Rating
500
Pipe schematic from manhole J 0166 to J 0165
MH: J 0166MH: J 0165downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 01660 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAGNESIUM H.O. START2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start289.6 ft. MGP - General Photograph468.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 12"489.7 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"503 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish503 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish503 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH506.1 ft. AMH - Downstream Manhole, Survey Ends - J 0165

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    289.6 ft. - General Photograph

Observations (13)

DistanceCodeObservation
0AMHJ 0166
289.6MGP
0MWM
2.2SAV
489.7TBA
506.1AMHJ 0165
503DAGS
2.2MGOMAGNESIUM H.O. START
503SAV
503MGOMAGNEZIUM H.O. FINISH
468.5TFA
2.2DAGS
0MWL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-01-30T04:17:37-08:00
documentation
PRO PIPE
is_lateral_inspection
false