Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 27, 2017, 06:39 AM
  • J 0186_J 0185 _01262017_225519.mp4

Date
01/26/2017
W/O
619081
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00055
PipeID
P11425
Time
10:39 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4095
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
SAN PEDRO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47A
Purpose
Routine Assessment
Project
WO_619081_TV05161_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
J 0186
Downstream MH
J 0185
Dir. of Survey
Downstream
Length Surveyed
184.4 ft.
Total Length
184.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole J 0186 to J 0185
MH: J 0186MH: J 0185downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 01860 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAGNEZIUM H.O COATING start91.6 ft. LR - Alignment Right, 10 %181.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish181.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish181.3 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish184.4 ft. AMH - Downstream Manhole, Survey Ends - J 0185

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
181.3DAGS
91.6LR
2.1DAGS
181.3SAV
181.3MGOMAGNEZIUM H.O COATING finish
0AMHJ 0186
2.2SAV
2.2MGOMAGNEZIUM H.O COATING start
0MWM
184.4AMHJ 0185

Properties (6)

additional_info
SC318637
custom_field_two
3
customer
LACSD
datetime
2017-01-26T22:39:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false