Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 27, 2017, 11:22 AM
  • J 0178_J 0177 _01272017_034155.mp4

Date
01/27/2017
W/O
619081
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00055
PipeID
P11417
Time
3:22 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4095
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
SAN PEDRO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47A
Purpose
Routine Assessment
Project
WO_619081_TV05161_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
J 0178
Downstream MH
J 0177
Dir. of Survey
Downstream
Length Surveyed
516.7 ft.
Total Length
516.7 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole J 0178 to J 0177
MH: J 0178MH: J 0177downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 01782.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING start2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start237.5 ft. MGP - General Photograph317.4 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES423.8 ft. MGP - General Photograph511.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish511.5 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish511.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish516.7 ft. AMH - Downstream Manhole, Survey Ends - J 0177

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    237.5 ft. - General Photograph

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES

    317.4 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    423.8 ft. - General Photograph

Observations (13)

DistanceCodeObservation
511.5SAV
0MWL
0MWM
2.1DAGS
511.5MGOMAGNEZIUM H.O COATING finish
317.4SAP
0AMHJ 0178
516.7AMHJ 0177
423.8MGP
2.1MGOMAGNEZIUM H.O COATING start
2.1SAV
511.5DAGS
237.5MGP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-01-27T03:22:31-08:00
documentation
PRO PIPE
is_lateral_inspection
false