Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 07:17 AM
  • 22 0992_22 0991_11192020_233424.mp4

Date
11/19/2020
W/O
854940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17362
Time
11:17 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8253
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_854940_TV22109_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0992
Downstream MH
22 0991
Dir. of Survey
Downstream
Length Surveyed
396.3 ft.
Total Length
396.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0992 to 22 0991
MH: 22 0992MH: 22 0991downstream0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 4 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 09920 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start44.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"70.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start101.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"249.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"347.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"393.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish393.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish393.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish396.3 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK396.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0991396.3 ft. MGO - General Observation - ROACHES IN MH

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    70.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    396.3 ft. - General Observation - ROACHES IN MH

Observations (21)

DistanceCodeObservation
2SAP
393.9SSS
393.9DAGS
199.6TFC
2DAGS
393.9SAP
396.3MGOCONNECTION AT MH 9 OCLOCK
101.3TFC
44.1TFC
0MGOROACHES IN MH
0MWL
249.3TFC
396.3AMH22 0991
146.7TFC
0MGOCONNECTION AT MH 4 OCLOCK
396.3MGOROACHES IN MH
347.1TFC
298TFC
0AMH22 0992
0MWM
70.7SSS

Properties (7)

additional_info
630069111920201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-19T23:17:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false