Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 07:40 AM
  • 22 0990_22 0989_11192020_235009.mp4

Date
11/19/2020
W/O
854940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17360
Time
11:40 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8253
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_854940_TV22109_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0990
Downstream MH
22 0989
Dir. of Survey
Downstream
Length Surveyed
228.4 ft.
Total Length
228.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0990 to 22 0989
MH: 22 0990MH: 22 0989downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 09900 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start25.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"79.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"173.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"226.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish226.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish226.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish228.4 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK228.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0989228.4 ft. MGO - General Observation - ROACHES IN MH

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    228.4 ft. - General Observation - ROACHES IN MH

Observations (19)

DistanceCodeObservation
25.6TFC
226.8DAGS
0MWM
2DAGS
0AMH22 0990
2SAP
226.8SAP
79.4TFC
226.8SSS
0MWL
173.6TFC
228.4MGOCONNECTION AT MH 3 OCLOCK
228.4AMH22 0989
0MGOROACHES IN MH
177.5TFC
128.9TFC
228.4MGOROACHES IN MH
0MGOCONNECTION AT MH 3 OCLOCK
15.9SSS

Properties (7)

additional_info
630069111920201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-19T23:40:58-08:00
documentation
PROPIPE
is_lateral_inspection
false