Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 08:04 AM
  • 22 0988_22 0987_11202020_001018.mp4

Date
11/20/2020
W/O
854940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17358
Time
12:04 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8253
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_854940_TV22109_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0988
Downstream MH
22 0987
Dir. of Survey
Downstream
Length Surveyed
86.1 ft.
Total Length
86.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0988 to 22 0987
MH: 22 0988MH: 22 0987downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 09880 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"20.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.4 ft. MGO - General Observation - MAG COATING THROUGHOUT68.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"73 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"83.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish83.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish86.1 ft. AMH - Downstream Manhole, Survey Ends - 22 098786.1 ft. MGO - General Observation - ROACHES IN MH86.1 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    49.4 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - ROACHES IN MH

    86.1 ft. - General Observation - ROACHES IN MH

Observations (17)

DistanceCodeObservation
2DAGS
2SAP
68.8TFC
73TFC
15.4TFC
0MGOCONNECTION AT MH 9 OCLOCK
86.1AMH22 0987
86.1MGOROACHES IN MH
0MWL
0MGOROACHES IN MH
0AMH22 0988
83.6DAGS
86.1MGOCONNECTION AT MH 3 OCLOCK
49.4MGOMAG COATING THROUGHOUT
83.6SAP
0MWM
20.1TFC

Properties (7)

additional_info
630069111920201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-20T00:04:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false