Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 08:23 AM
  • 22 0986_22 0957_11202020_004052.mp4

Date
11/20/2020
W/O
854940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17356
Time
12:23 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8253
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_854940_TV22109_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0986
Downstream MH
22 0957
Dir. of Survey
Downstream
Length Surveyed
362.5 ft.
Total Length
362.6 ft.
Structural Index
3
Structural Quick
4131
Structural Rating
9
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 22 0986 to 22 0957
MH: 22 0986MH: 22 0957downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 09860 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"12.2 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"14.9 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES56.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"60 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"105.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start212.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"215.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"256.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"260.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"361.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish361.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish361.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish362.6 ft. MGO - General Observation - ROACHES IN MH362.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0957362.6 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK

Observation photos (6)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    14.9 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    190.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    362.6 ft. - General Observation - ROACHES IN MH

Observations (26)

DistanceCodeObservation
190.1SSS
109.1TFC
256.6TFC
2DAGS
362.6MGOROACHES IN MH
0MWM
14.9FM
260.5TFC
158.2TFC
362.6AMH22 0957
361.4SAP
2SAP
105.8TFA
362.6MGOCONNECTION AT MH 3 OCLOCK
0MGOROACHES IN MH
7.2TFC
0AMH22 0986
12.2TFA
215.4TFA
212.1TFC
60TFC
162.1TFC
361.4SSS
361.4DAGS
56.9TFC
0MWL

Properties (7)

additional_info
630069111920201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-20T00:23:15-08:00
documentation
PRO PIPE
is_lateral_inspection
false