Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2020, 10:49 AM
  • 22 1013_22 1012_11162020_030106.mp4

Date
11/16/2020
W/O
854940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17382
Time
2:49 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8199
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_854940_TV22109_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 1013
Downstream MH
22 1012
Dir. of Survey
Downstream
Length Surveyed
271.7 ft.
Total Length
271.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 1013 to 22 1012
MH: 22 1013MH: 22 1012downstream0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10132 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.7 ft. MGO - General Observation - MAG COATING THROUGHOUT3.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"64.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"269.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish269.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish271.7 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK271.7 ft. AMH - Downstream Manhole, Survey Ends - 22 1012271.7 ft. MGO - General Observation - ROACHES IN MH

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    3.7 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    271.7 ft. - General Observation - ROACHES IN MH

Observations (18)

DistanceCodeObservation
0MGOROACHES IN MH
53.8TBA
269.3DAGS
112.9TFC
271.7MGOCONNECTION AT MH 3 OCLOCK
0MWL
3.7MGOMAG COATING THROUGHOUT
3.7SAP
166.2TFC
269.3SAP
223.2TFC
0MWM
64.5TFC
0AMH22 1013
271.7AMH22 1012
271.7MGOROACHES IN MH
2DAGS
11.3TFC

Properties (7)

additional_info
630069111620003
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-16T02:49:04-08:00
documentation
PRO PIPE
is_lateral_inspection
false