Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 19, 2020, 08:53 AM
  • 22 0997A_22 0997_11192020_010423.mp4

Date
11/19/2020
W/O
854940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00819
PipeID
P17368
Time
12:53 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8252
Sewer Name
LORAINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_854940_TV22109_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0997A
Downstream MH
22 0997
Dir. of Survey
Downstream
Length Surveyed
166.1 ft.
Total Length
166.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4131
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 22 0997A to 22 0997
MH: 22 0997AMH: 22 0997downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 0997A0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK0 ft. MGO - General Observation - ROACHES IN MH2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start12.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"41.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"66 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"90.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.1 ft. RMC - Roots Medium Connection, from 08 to 11 o'clock, 10 %, within 8 inches of joint: YES113.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"142.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish164.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish166.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0997166.1 ft. MGO - General Observation - ROACHES IN MH

Observation photos (6)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Roots Medium Connection, from 08 to 11 o'clock, 10 %, within 8 inches of joint: YES

    90.1 ft. - Roots Medium Connection, from 08 to 11 o'clock, 10 %, within 8 inches of joint: YES

  • General Observation - ROACHES IN MH

    166.1 ft. - General Observation - ROACHES IN MH

Observations (19)

DistanceCodeObservation
2SAP
0MWM
0AMH22 0997A
164.3SAP
2MGOMAG COATING THROUGHOUT
12.7TFC
66TFC
0MWL
166.1AMH22 0997
142.2TFC
90.1TF
2DAGS
90.1RMC
0MGOCONNECTION AT MH 9 OCLOCK
0MGOROACHES IN MH
41.3TFC
113.9TFC
166.1MGOROACHES IN MH
164.3DAGS

Properties (7)

additional_info
630069111820201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-11-19T00:53:43-08:00
documentation
PRO PIPE
is_lateral_inspection
false