Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 25, 2020, 08:18 AM
  • H 0109_H 0110_11252020_003020.mp4

Date
11/25/2020
W/O
855021
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00165
PipeID
P10561
Time
12:18 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8223
Sewer Name
JOINT OUTFALL H - UNIT 1F
City
HUNTINGTON PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_855021_TV01220_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 0110
Downstream MH
H 0109
Dir. of Survey
Upstream
Length Surveyed
5 ft.
Total Length
5 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole H 0110 to H 0109
MH: H 0110MH: H 0109upstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - DUE TO SLUDGE0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES3 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. MWL - Water Level, 35 %of cross sectional area5 ft. MWM - Water Mark, 45 %of cross sectional area5 ft. AMH - Downstream Manhole, Survey Begins - H 0110

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Settled Fine,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Settled Fine, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Survey Abandoned - DUE TO SLUDGE

    5 ft. - Survey Abandoned - DUE TO SLUDGE

Observations (10)

DistanceCodeObservation
2SAP
5SAP
5MSADUE TO SLUDGE
0MWL
0MWM
0AMHH 0110
2DSF
2SSS
5SSS
5DSF

Properties (6)

custom_field_three
AGGRERGATE PRJECTING, SLUDGE
custom_field_two
5
customer
1
datetime
2020-11-25T00:18:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false