Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2020, 12:09 PM
  • C 0658_C 0657_11092020_043427.mp4

Date
11/09/2020
W/O
854871
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00266
PipeID
P23924
Time
4:09 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7398
Sewer Name
JOINT OUTFALL C - UNIT 3F
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_854871_TV29113_OCT2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
C 0658
Downstream MH
C 0657
Dir. of Survey
Downstream
Length Surveyed
326 ft.
Total Length
326 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
150
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
150
Pipe schematic from manhole C 0658 to C 0657
MH: C 0658MH: C 0657downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 065848.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"51.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"72.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES76.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start98.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"109.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"148.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"163.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"193.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"204.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"247.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"250.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"293.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"323.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326 ft. AMH - Downstream Manhole, Survey Ends - C 0657

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    72.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    76.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
109.5TF
72.4CM
326AMHC 0657
204.8TFC
193.9TFC
98.6TFC
293.8TFC
76.5CM
163.1TFC
0MWL
323.1CM
148.2TFC
48.9TFC
0MWM
247.7TFC
0AMHC 0658
51.4TF
250.4TFC

Properties (7)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-11-09T04:09:55-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
37482