Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 06:17 AM
  • 20 0262_20 0261_11172020_223504.mp4

Date
11/17/2020
W/O
855595
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19229
Time
10:17 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8251
Sewer Name
35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_855595_TV20009_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0262
Downstream MH
20 0261
Dir. of Survey
Downstream
Length Surveyed
337 ft.
Total Length
337 ft.
Structural Index
2
Structural Quick
3L2S
Structural Rating
401
O&M Index
2
O&M Quick
4131
O&M Rating
141
Overall Index
2
Overall Quick
Overall Rating
542
Pipe schematic from manhole 20 0262 to 20 0261
MH: 20 0262MH: 20 0261downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 OCLOCK/ACTIVE0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02622 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"103 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start107.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.2 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES155.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"208 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"237 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish256.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"308 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start308.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"335.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish335.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish335.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish337 ft. AMH - Downstream Manhole, Survey Ends - 20 0261337 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: YES

    119.2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
0MWM
6.2TFC
256.3TFC
2SSS
119.2DAGS
237MWLS
335.2SAP
2MGO45% MAG COAT
54.5TFC
107.1TFC
0MGOCONN @ MH 3 OCLOCK/ACTIVE
2SAP
308MWLS
335.2DAGS
337AMH20 0261
155.5TFC
335.2SSS
337MWLS
0MWL
0AMH20 0262
308.8TFC
208TFC
103MWLS
2DAGS

Properties (7)

additional_info
630069111720201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-17T22:17:48-08:00
documentation
PRO PIPE
is_lateral_inspection
false