Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 06:35 AM
  • 20 0261_20 0260_11172020_225410.mp4

Date
11/17/2020
W/O
855595
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19228
Time
10:35 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8251
Sewer Name
35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_855595_TV20009_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0261
Downstream MH
20 0260
Dir. of Survey
Downstream
Length Surveyed
377.5 ft.
Total Length
377.5 ft.
Structural Index
2
Structural Quick
3N2V
Structural Rating
453
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
603
Pipe schematic from manhole 20 0261 to 20 0260
MH: 20 0261MH: 20 0260downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02610 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT23.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"25 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish71.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"123.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"206 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start224.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"276.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"375.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish375.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish375.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish376 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish377.5 ft. AMH - Downstream Manhole, Survey Ends - 20 0260

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
71.6TFC
376MWLS
25MWLS
0AMH20 0261
23.1TFC
2SSS
2SAP
0MWL
2MWLS
0MWM
375.7SAP
2DAGS
123.6TFC
206MWLS
224.8TFC
377.5AMH20 0260
172.1TFC
2MGO45% MAG COAT
324.6TFC
276.5TFC
375.7SSS
375.7DAGS

Properties (7)

additional_info
630069111720201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-17T22:35:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false