Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 06:39 AM
  • 20 0259_20 0258_11162020_230358.mp4

Date
11/16/2020
W/O
855595
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19226
Time
10:39 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8215
Sewer Name
35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_855595_TV20009_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0259
Downstream MH
20 0258
Dir. of Survey
Downstream
Length Surveyed
387.8 ft.
Total Length
387.8 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
385
O&M Index
2
O&M Quick
412N
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
543
Pipe schematic from manhole 20 0259 to 20 0258
MH: 20 0259MH: 20 0258downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02590 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start13 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"151.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"209 ft. MWL - Water Level, 45 %of cross sectional area235 ft. MWL - Water Level, 20 %of cross sectional area257.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"306.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"355.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"387.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish387.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish387.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish387.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0258

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0AMH20 0259
2SAP
205.3TFC
257.2TFC
53.4TFC
151.6TFC
2SSS
306.8TFC
235MWL
387.8SSS
355.4TFC
387.8SAP
13TFC
0MWM
0MWL
387.8DAGS
2DAGS
209MWL
102.4TFC
387.8AMH20 0258

Properties (7)

additional_info
630069111620201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-16T22:39:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false