Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 19, 2017, 07:35 AM
  • 22 0116_22 0115_6192017_005402.mp4

Date
06/19/2017
W/O
0646109
Weather
Operator/Surveyor
MARTIN
Sewer ID
Z00805
PipeID
P16358
Time
12:35 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
Sewer Name
22 DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Maintenance Related
Project
20170619MDM_DISTRICT_22_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
22 0116
Downstream MH
22 0115
Dir. of Survey
Downstream
Length Surveyed
443.7 ft.
Total Length
443.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 22 0116 to 22 0115
MH: 22 0116MH: 22 0115downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWL - Water Level, 20 %of cross sectional area1 ft. MGO - General Observation - NEW ASPHALT AT 108' & 120'2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE36.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped77 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped85.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped107.5 ft. MGP - General Photograph118.9 ft. MGP - General Photograph149.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open158.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open167.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open181.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open214.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped270.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped287.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open335.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped343.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped407.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped433.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE443.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active443.7 ft. AMH - Downstream Manhole, Survey Ends - 1:40AM

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • General Photograph

    107.5 ft. - General Photograph

  • General Photograph

    118.9 ft. - General Photograph

Observations (24)

DistanceCodeObservation
443.7AMH1:40AM
287.1TFOpen
343.2TFCCapped
443.2MGOConn. @ Mh, 3 O' Clock. Active
167.7TBOpen
407.5TFCCapped
0MGOConn. @ Mh, 9 O' Clock. Active
181.9TFOpen
149.8TFOpen
85.1TFCCapped
214.2TFCCapped
2SSSPEELING CONCRETE
1MGONEW ASPHALT AT 108' & 120'
0MWM
0AMH12:45AM
0MWL
77TFCCapped
335.1TFCCapped
158.1TFOpen
107.5MGP
270.4TFCCapped
433.2SSSPEELING CONCRETE
36.8TFCCapped
118.9MGP

Properties (4)

customer
LACSD
datetime
2017-06-19T00:35:00-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false