Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2018, 01:36 PM
  • 18 0759_18 0758_8132018_080659.mp4

Date
08/13/2018
W/O
0721531
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00706
PipeID
P14616
Time
6:36 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7784
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Woods
Location Code
E
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
20180813SHO_SOUTH_WHITTIER_OUTFALL_TRUNK_SECTS_1234
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
18 0759
Downstream MH
18 0758
Dir. of Survey
Downstream
Length Surveyed
499.7 ft.
Total Length
499.7 ft.
Structural Index
3
Structural Quick
3400
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 18 0759 to 18 0758
MH: 18 0759MH: 18 0758downstream0 ft. MGO - General Observation - ACTIVE CONNECTION IN THE MH @ 40 ft. AMH - Upstream Manhole, Survey Begins - MH 7590 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area9 ft. MGO - General Observation - 80% MAG COAT INTACT34.3 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start89.9 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish138.1 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start196.6 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish334.4 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start353.6 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish374.6 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start457.2 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish499.7 ft. AMH - Downstream Manhole, Survey Ends - MH 758

Observation photos (3)

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start

    34.3 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start

    138.1 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start

    374.6 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
499.7AMHMH 758
9MGO80% MAG COAT INTACT
196.6SAP
353.6SAP
0MGOACTIVE CONNECTION IN THE MH @ 4
34.3SAP
138.1SAP
89.9SAP
0AMHMH 759
457.2SAP
374.6SAP
334.4SAP
0MWM
0MWL

Properties (6)

custom_field_three
SAP
custom_field_two
3
customer
LACSD
datetime
2018-08-13T06:36:38-07:00
documentation
OBREGON, BRAR, VENDRYES, PARAISO
is_lateral_inspection
false