Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2017, 10:35 AM
  • 15 1040_15 1039_6232017_040524.mp4

Date
06/23/2017
W/O
0647703
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00626
PipeID
P12801
Time
3:35 AM
Certificate
104-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0573
Sewer Name
15 RUSH STREET TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
20170623MDM_RUSH_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
15 1039
Downstream MH
15 1040
Dir. of Survey
Upstream
Length Surveyed
326.8 ft.
Total Length
326.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4332
O&M Rating
22
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole 15 1039 to 15 1040
MH: 15 1039MH: 15 1040upstream0 ft. AMH - Upstream Manhole, Survey Ends - 4:40AM0.6 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish0.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active19.6 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start19.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish26.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open92.9 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start92.9 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish92.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open117.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open122.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open148.4 ft. MGP - General Photograph - 10" VCP207.5 ft. MWM - Water Mark, 30 %of cross sectional area207.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open243 ft. MWM - Water Mark, 50 %of cross sectional area243 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start243 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish253.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active263.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open277.5 ft. MWM - Water Mark, 20 %of cross sectional area277.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start277.5 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish302.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open324.8 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start326.8 ft. MWM - Water Mark, 50 %of cross sectional area326.8 ft. AMH - Downstream Manhole, Survey Begins - 3:55AM326.8 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (6)

  • Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    49.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    83.8 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph - 10" VCP

    178.4 ft. - General Photograph - 10" VCP

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    233.9 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Start

    307.2 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start

Observations (27)

DistanceCodeObservation
300TFOpen
63TFOpen
49.3MWM
83.8MWM
0MWM
119.3MWM
83.8DAGS
233.9DAGS
326.2DAGS
0AMH3:55AM
178.4MGP10" VCP
24.7TFOpen
326.8AMH4:40AM
83.8DAGS
203.9TFOpen
0MWL
233.9DAGS
2DAGS
73.5TFActive
49.3DAGS
209.5TFOpen
233.9TFOpen
307.2DAGS
326.2MGOConn. @ Mh, 9 O' Clock. Active
49.3DAGS
307.2DAGS
119.3TFOpen

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2017-06-23T03:35:35-07:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false
year_laid
19850402