Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 6, 2018, 11:33 AM
  • 05 1204_05 1181_862018_044035.mp4

Date
08/06/2018
W/O
0717904
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00514
PipeID
P06421
Time
4:33 AM
Certificate
U11506022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0940
Sewer Name
05 ROSECRANS AVENUE TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
08062018VMR_ROSECRANS_AVE_TRUNK
Material
NRCP
Shape
Circular
Height
9.579999923706055 in.
Upstream MH
05 1204
Downstream MH
05 1181
Dir. of Survey
Downstream
Length Surveyed
72.9 ft.
Total Length
72.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
5121
O&M Rating
7
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 05 1204 to 05 1181
MH: 05 1204MH: 05 1181downstream0 ft. AMH - Upstream Manhole, Survey Begins - 04:40 AM0 ft. MWM - Water Mark, 5 %of cross sectional area - DRY0 ft. MWL - Water Level, 5 %of cross sectional area - DRY17.1 ft. MGO - General Observation - ADHESIVE IS PEALING OFF19.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 2" - Open21.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 2" - Open22.8 ft. DAZ - Deposits Attached Other, 100 %of cross sectional area, from 07 to 06 o'clock, , within 8 inches of joint: NO, Start66.8 ft. OBZ - Obstacles Other, 5 %of cross sectional area, at 06 o'clock - nrcp material70.2 ft. DAZ - Deposits Attached Other, 100 %of cross sectional area, from 07 to 06 o'clock, , within 8 inches of joint: NO, Finish72.9 ft. AMH - Downstream Manhole, Survey Ends - 05:12 am

Observation photos (2)

  • General Observation - ADHESIVE IS PEALING OFF

    17.1 ft. - General Observation - ADHESIVE IS PEALING OFF

  • Obstacles Other, 5 %of cross sectional area, at 06 o'clock - nrcp material

    66.8 ft. - Obstacles Other, 5 %of cross sectional area, at 06 o'clock - nrcp material

Observations (10)

DistanceCodeObservation
66.8OBZnrcp material
0AMH04:40 AM
72.9AMH05:12 am
0MWMDRY
0MWLDRY
21.7TFOpen
17.1MGOADHESIVE IS PEALING OFF
19.1TFOpen
70.2DAZ
22.8DAZ

Properties (7)

custom_field_two
4
customer
LACSD
datetime
2018-08-06T04:33:30-07:00
documentation
REVELES, OLIVER III, YOUNG
is_lateral_inspection
false
lining
CIPP
year_laid
20050531