Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 24, 2020, 07:34 PM
  • H 0417A_H 0417_11242020_114323.mp4

Date
11/24/2020
W/O
848810
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00177
PipeID
P10851
Time
11:34 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8222
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
BASSETT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_848810_TV15130_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0417A
Downstream MH
H 0417
Dir. of Survey
Downstream
Length Surveyed
146.6 ft.
Total Length
146.6 ft.
Structural Index
2
Structural Quick
3E2E
Structural Rating
142
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
146
Pipe schematic from manhole H 0417A to H 0417
MH: H 0417AMH: H 0417downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0417A2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 10"46.6 ft. LL - Alignment Left, 30 %143.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146.6 ft. AMH - Downstream Manhole, Survey Ends - H 0417

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 10"

    5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 10"

  • Alignment Left, 30 %

    46.6 ft. - Alignment Left, 30 %

Observations (11)

DistanceCodeObservation
2SSS
0MWM
146.6SSS
0MWL
5TB
46.6LL
143.5SAP
0AMHH 0417A
2MGOMAG COAT
146.6AMHH 0417
2SAP

Properties (6)

custom_field_three
SPALLING, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-11-24T11:34:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false