Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 10:38 AM
  • 02 2317_02 1260_11202020_024401.mp4

Date
11/20/2020
W/O
855023
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00288
PipeID
P08497
Time
2:38 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8309
Sewer Name
MONTEREY PARK DIVERSION TRUNK
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
WO_855023_TV02100_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
30 in.
Upstream MH
02 1260
Downstream MH
02 2317
Dir. of Survey
Upstream
Length Surveyed
14.1 ft.
Total Length
14.1 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 02 1260 to 02 2317
MH: 02 1260MH: 02 2317upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 23170 ft. MGO - General Observation - STOP LOG DOWN @ MH0.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish11.1 ft. MGO - General Observation - (1) RAT @ MH12 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.1 ft. MWM - Water Mark, 10 %of cross sectional area14.1 ft. MGO - General Observation - ROACHES @ MH14.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK14.1 ft. AMH - Downstream Manhole, Survey Begins - 02 126014.1 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWM
0MGOROACHES @ MH
3MGO(1) RAT @ MH
0MGOCONNECTION AT MH 3 O'CLOCK
2.1SAP
2.1SSS
14SSS
14SAP
0AMH02 1260
14.1AMH02 2317
14.1MGOSTOP LOG DOWN @ MH
0MWL

Properties (7)

additional_info
630075111920203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2020-11-20T02:38:23-08:00
documentation
PROPIPE
is_lateral_inspection
false