Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2020, 08:33 AM
  • 02 1263_02 1262_11202020_004401.mp4

Date
11/20/2020
W/O
855023
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00288
PipeID
P04669
Time
12:33 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8309
Sewer Name
MONTEREY PARK DIVERSION TRUNK
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
WO_855023_TV02100_OCT2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
02 1263
Downstream MH
02 1262
Dir. of Survey
Downstream
Length Surveyed
285.3 ft.
Total Length
285.3 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
285
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
397
Pipe schematic from manhole 02 1263 to 02 1262
MH: 02 1263MH: 02 1262downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 02 12632 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 75% MAG COAT2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start283 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish285 ft. MGO - General Observation - ROACHES @ MH285.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1262285.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2DAGS
2MGO75% MAG COAT
0MWL
283DAGS
285.3SSS
0MWM
285MGOROACHES @ MH
2.2SSS
0MGOROACHES @ MH
2.2SAP
0AMH02 1263
285.3AMH02 1262
285.3SAP

Properties (7)

additional_info
630075111920203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2020-11-20T00:33:43-08:00
documentation
PROPIPE
is_lateral_inspection
false